The RMS Push-Up System
The RMS Push-Up System is in transit for two major assignments in South East Asia. Details to follow.

Rigging becomes RMS
Rigging Management Systems AB becomes rms lifting systems ab.

Holstein Spar Project
End of September, we will commence with the 7th Spar project. There will be 9 lifts of sub sections during a 9 month period.


Gunnison Truss Spar Project
In April, we will commence with the 6th Spar project. There will be 6 lifts of sub sections during a 6 month period.

Grane Production Module
In the end of March 2002 RMS lifted C01 30 m, giving access for C10/20 to pass under by trailer, positioning and maiting of the two modules. The lifting operation was carried out at Kvaerner Egersund, Norway.

Propylene Plant, Scanraff
In February 2002, RMS erected a 350 ton, 95 meter long, dia 6 meter Propylene Column at Scanraff, Lysekil, Sweden. The column is the tallest, so for, erected in Scandinavia.

Lifting and Load-Out WIP Valhall
RMS has carried out lifting and load-out of a 1000 ton Skid Deck at Bladt Industries A/S, Aalborg. Denmark

Horn Mountain Truss Spar Project
In November 2001, we completed lifting of 6 no. of Sub-sections for Horn Mountain project.

Nansen & Boomvang Truss Spar Projects
End of May 2001 we completed lifting of 10 Sub-sections.

Volvo PV, Olofström
Lifting and shifting of 2 no. Car Body Presses.

Lifting and Skidding of a 1700 ton Drilling Deck
RMS - TransRig were assigned to carry out lifting and skidding of a 1700 ton Drilling Deck at Kvaerner Warnow Werft, Germany. The job was completed January 2001. In addition we were also contracted to lift a 2000 ton sub-section of the main deck.

SSAB - No. 3 Blast Furnace, Luleå Sweden
The transportation and lifting work was completed on schedule and the new blast furnace, with double capacity, is now in operation after 73 days stand still only.

Diana Spar Hull Project
RMS has successfully completed the lifting of 23 sub-sections for the Diana project during a 15 month period. The total weight of the sub-sections was 12 000 ton with the individual sections weighing up to 1 200 ton.


TransQ Qualification System
We have the pleasure of confirming that Rigging Management Systems AB, is now qualified for the following categories in TransQ Qualification System for suppliers to the Scandinavian Transport Utilities:

4.14.03 Lifting Equipment and Hoists
8.09.03 Rental of Cranes and Special Vehicles
9.01.99 Other Railway Specific Works
9.02.99 Other Aviation Specific Works
9.04.99 Other General/Business Wide Works

TransQ Id. no 200404

Öresund - High Bridge Project
RMS has completed its contract with Kockums AB. RMS was responsible for the Multi-wheel - Skidding - Load out services of bridge sections, weighing up to 2 600 tons. The equipment has a nominal capacity of 4 000 tons and is now available for hire.